{"id":2,"date":"2012-06-02T18:05:17","date_gmt":"2012-06-02T18:05:17","guid":{"rendered":"http:\/\/www.elplanbg.com\/EN\/wordpress\/?page_id=2"},"modified":"2013-12-16T18:56:59","modified_gmt":"2013-12-16T16:56:59","slug":"design-en","status":"publish","type":"page","link":"http:\/\/www.elplanbg.com\/en\/design-en\/","title":{"rendered":"Design"},"content":{"rendered":"<p align=\"justify\"><img loading=\"lazy\" class=\"alignleft\" title=\"design\" alt=\"\" src=\"http:\/\/www.elplanbg.com\/en\/wordpress\/wp-content\/uploads\/2012\/10\/preview.jpg\" width=\"350\" height=\"234\" \/><strong><br \/>\n<\/strong><\/p>\n<h3 style=\"text-align: center;\">Design of electrical instalations,\u00a0Client brief,\u00a0Consulting<\/h3>\n<p align=\"justify\">\u00a0<strong>\u00a0 \u00a0 \u00a0\u00a0<span style=\"text-decoration: underline;\">Design of electrical instalations<\/span><\/strong><\/p>\n<p align=\"justify\"><strong>\u00a0 \u00a0 Designing on all stages of planning (Investment, Technoical, Work and Executives) sutable with \u0441 REGULATION \u2116 4 \u043e\u0442 21.05.2001 \u0433. about cover and contents of investment projects. Published from secretary of MRRB \u043e\u0431\u043d., \u0414\u0412, \u0431\u0440. 51 from 5.06.2001 \u0433.,efective from 5.06.2001 \u0433. and REGULATION \u2116 4 from 14.08.2003 \u0433. about design, implementation and explotation of electrical instalation in buildings. Published from secretary of MRRB and secretari of energetics and energe resources, \u043e\u0431\u043d., \u0414\u0412, \u0431\u0440. 76 from 29.08.2003 \u0433. Every project is compsed from three main pasrts:<\/strong><strong>\u00a0 \u00a0 \u00a0 \u00a0<\/strong><\/p>\n<p align=\"justify\"><strong>&#8211;<em>Text part wit calculation and explanations\u00a0<\/em><\/strong><br \/>\n<strong>&#8211;<em>\u00a0Graphic part &#8211; drawings and shematics\u00a0<\/em><\/strong><br \/>\n<strong>&#8211;\u00a0<em>Standards and regulations<\/em><\/strong><\/p>\n<p align=\"center\"><strong><span style=\"text-decoration: underline;\">Client brief<\/span><\/strong><\/p>\n<p align=\"justify\"><strong>\u00a0\u00a0\u00a0In foundation of designing of all elctrical instalation needs and ideas of the clients are leading. These ideas must be connected with the relative standards and technical ability. In most cases the client wants a complex designing with one solution \u2013 computer, phone network and power supply shoud be deployed in all working places and also Security, Fire, CCTV instalation, etc. The client gives the number of working places and other ideas about instalation and the designer adds the technical requirements and makes everything to be capable to work together and to be in co-ordination with the valid standards.<\/strong><\/p>\n<p align=\"justify\"><strong>\u00a0\u00a0\u00a0With a technically correct\u00a0 breif the client can demands offers about designing or building of the systems.<\/strong><\/p>\n<p align=\"center\"><strong><span style=\"text-decoration: underline;\">Consulting<\/span><\/strong><\/p>\n<p align=\"left\"><strong>\u00a0\u00a0\u00a0Supervison, serveillance and consulting services about designing and implementation of electrical instalations &#8211; high and low voltage (UPS Power supply, Structured Cabling Systems, Fire alarms,Access Control, CCTV, CaTV).<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Design of electrical instalations,\u00a0Client brief,\u00a0Consulting \u00a0\u00a0 \u00a0 \u00a0\u00a0Design of electrical instalations \u00a0 \u00a0 Designing on all stages of planning (Investment, Technoical, Work and Executives) sutable with \u0441 REGULATION \u2116 4 \u043e\u0442 21.05.2001 \u0433. about cover and contents of investment projects. Published from secretary of MRRB \u043e\u0431\u043d., \u0414\u0412, \u0431\u0440. 51 from 5.06.2001 \u0433.,efective from 5.06.2001 \u0433. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/pages\/2"}],"collection":[{"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/comments?post=2"}],"version-history":[{"count":10,"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/pages\/2\/revisions"}],"predecessor-version":[{"id":27,"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/pages\/2\/revisions\/27"}],"wp:attachment":[{"href":"http:\/\/www.elplanbg.com\/en\/wp-json\/wp\/v2\/media?parent=2"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}