23rd February, 2026



Bulgarian        English

scheme

Building of electrical installation for light (2/2)

Part 2: Schemes for control of lighting (lamps) by electrical switchers

Scheme 1: Control of luminaries (lamps) from simple switch

obiknoven
Phase conductor (L) is disconnected by power switch (Sw1), connections are made in the junction box (distribution box). When you closed the switch Sw1, the power circuit is closed and the light (lamp) lights up.

More

Advertisement

Archives

Advertisement